
TheRenewableEnergyHandbook | page 35 | https://thedailydialectics.com/pdfs/tesla/TheRenewableEnergyHandbook/TheRenewableEnergyHandbook.pdf
STEP #8 : Insulation All holes and other gaps must now be insulated with silicone; that includes the ones through which the copper wires run at the back of the panel. STEP #9 : Moisture protection Since the panel is not airtight, a hole must be drilled at the bottom of the panel in order to avoid…